Application

Check moisture level of timber prior to application. Shake Floor Seal for a few minutes before use. Use a synthetic or lambs wool applicator, pad or roller. Do not thin. Avoid over-rigorous application. Ensure good ventilation. Do not use below 10°C. Always check adhesion prior to application by applying to a small test area.

Note: For floors where there is a risk of side-bonding, e.g. end grain floors, softwood plank floors and hardwood floors with under-floor heating, it is recommended that Ronseal Contractor Quick Prime is used for the initial application.